Ready-mix concrete typically starts around $115 per yard but could cost upwards of $150 or more, depending on the mix and your location. Consider that there will likely be additional fees for ready-mix for smaller projects, such as delivery or short-load fees.

How is the volume of ready mixed concrete determined?

Ready-mixed concrete is sold by volume measured in cubic yards. If you can determine the area of your concrete project (length x width for rectangular projects) and know the thickness of the slab, you can use the information in the Concrete Volume Calculator below to determine how much concrete you need. 12-inches thick – covers 27 square feet.

How many pre mix bags are needed for one cubic yard of concrete?

Estimate how many pre-mixed bags are needed for smaller projects when it isn’t practical to order a truckload of concrete. The table below shows the coverage of different sizes of pre-mix bags. On average, it will take 90 40lb bags, 60 60lb bags, or 45 80lb bags to fill one cubic yard of concrete.

Ready-mix concrete typically starts around $115 per yard but could cost upwards of $150 or more, depending on the mix and your location. Consider that there will likely be additional fees for ready-mix for smaller projects, such as delivery or short-load fees.

Ready-mixed concrete is sold by volume measured in cubic yards. If you can determine the area of your concrete project (length x width for rectangular projects) and know the thickness of the slab, you can use the information in the Concrete Volume Calculator below to determine how much concrete you need. 12-inches thick – covers 27 square feet.

How is 0.16 inch equal to a centimeter?

So, 0.16 inch times 2.54 is equal to 0.4064 centimeters. To calculate a inch value to the corresponding value in centimeter, just multiply the quantity in inch by 2.54 (the conversion factor). Here is the formula: Suppose you want to convert 0.16 inch into centimeters.

Estimate how many pre-mixed bags are needed for smaller projects when it isn’t practical to order a truckload of concrete. The table below shows the coverage of different sizes of pre-mix bags. On average, it will take 90 40lb bags, 60 60lb bags, or 45 80lb bags to fill one cubic yard of concrete.