What are the rules for electric conduit construction?
What are the rules for electric conduit construction? 1. Installation of the underground electric conduit system shall not begin until the contractor is issued prints stamped “ APPROVED FOR CONSTRUCTION ” and initialed by the Engineer assigned to the project. Any print(s) that are unstamped or stamped “preliminary” cannot be used for construction. What kind of conduit do I need for a 4 / 0 al Conductor? 3 Phase Primary Riser Conduit Detail for 4/0 AL Conductor or Greater Note: The owner/developer shall install the bottom joint of galvanized rigid steel conduit and KUA will install the top two (2)...