How many pallets can a c5 hold?
How many pallets can a c5 hold?
The aircraft is capable of transporting a maximum payload of 118,387kg. It is capable of carrying two Abrams main battle tanks, an Abrams tank plus two Bradley armoured fighting vehicles, 10 LAV light armoured vehicles, six Apache attack helicopters or 36 standard pallets type 463L.
How many 463L pallets fit on a c130j?
The stretched C-130J-30 can carry eight 463L pallets, 97 litters, 24 CDS (US Container Delivery System) bundles, 128 equipped combat troops or 92 paratroopers.
How many C 5s are there?
52 C-
The C-5M is a modernized version of the legacy C-5 designed and manufactured by Lockheed Martin. Currently the U.S. Air Force owns and operates 52 C-5B/C/M. They are stationed at Dover Air Force Base, Delaware; Travis AFB, California; Lackland AFB, Texas; and Westover Air Reserve Base, Massachusetts.
What is aircraft load planning?
Load Planners are aviation professionals who determine precisely how to distribute cargo, passengers, and fuel on a particular aircraft.
Can the C-5 carry a tank?
The newest C-5M Super Galaxy has the capability to lift two M1 Abrams tanks and can transport nearly a company of troops and gear anywhere in the world with aerial refueling. The C-5 is distinct for having both front and rear cargo ramps, allowing for much faster load and offload operations.
How much runway does a C-5 take off?
Takeoff and landing distance requirements for the plane at maximum-load gross weight are 8,300 ft (2,500 m) and 4,900 ft (1,500 m), respectively.
Why is it called a 463L pallet?
The “SS” represents Support System, the “463” represents an assigned general system category, 400β499 series for “Support Systems”, and the suffix “L” also represents “Support Systems”. The “463L” does not stand for the period that the pallet was initiated (April 1963); it is the name of the system.
Is C5 still in service?
The C-5M Super Galaxy strategic transport aircraft, a modernised version of the legacy C-5, was designed and manufactured by Lockheed Martin to extend the capability of the C-5 Galaxy fleet to remain in service at least until 2040. The C-5M aircraft is operated by the US Air Force (USAF).
How much runway does a C5 need?
Takeoff and landing distance requirements for the plane at maximum-load gross weight are 8,300 ft (2,500 m) and 4,900 ft (1,500 m), respectively. Its high-flotation main landing gear provides 28 wheels to distribute gross weight on paved or earth surfaces.
What is load planning?
Load planning in transportation is the process of consolidating cargo to maximize the capacity of each truck and driver so that multiple shipments can be delivered in the fewest number of vehicles. But it’s not as simple as squeezing the maximum number of pallets into a container.
Who prepare load and trim sheet?
15.5 Each airline/operator is responsible for the preparation and accuracy of the load/trim sheet.
What is loadload planning?
Load planning is the process of consolidating and optimizing the packing of cargo into a single truck or delivery vehicle. The ultimate goal is to move as much cargo as possible with the lowest number of vehicles. But itβs not as simple as squeezing the maximum number of pallets into a container.
What is the Air Force form for load planning?
If a manual load plan is required, use DD Form 2130 or Air Force (AF) Form 4080, Load/Sequence Breakdown Worksheet. 2. Load planning guidance by aircraft type, Model Design Series (MDS) is contained in the following AF and AMC publications.
What is the takeoff and landing distance of a C-5?
The C-5 loadmasters ensure cargo is secured and balanced before takeoff. Takeoff and landing distance requirements for the plane at maximum-load gross weight are 8,300 ft (2,500 m) and 4,900 ft (1,500 m), respectively. Its high-flotation main landing gear provides 28 wheels to distribute gross weight on paved or earth surfaces.
What is the best way to complete an air load plan?
The Integrated Computerized Deployment System (ICODES) is the only acceptable automated system for completing air load plans. In the event ICODES is unavailable, units will utilize reach back to obtain an ICODES generated load plan. If a manual load plan is required, use DD Form 2130 or Air Force (AF) Form 4080, Load/Sequence Breakdown Worksheet.