How to install a bow window at Andersen Windows?
How to install a bow window at Andersen Windows?
Flanges on the unit alone will not properly flash and seal the window. Follow these instructions carefully. For questions call 1-888-888-7020 Monday – Friday, 7 a.m. to 7 p.m. and Saturday, 8 a.m. to 4 p.m. central time. For more information and/or guides visit andersenwindows.com. Please leave this guide with building owner.
How do you install a bow window unit?
Unit Unit Unit Unit Unit • Turn units interior side up. • Carefully remove all Inside Stopnails with a hammer and block of wood. • Remove theHeadand Sill Inside StopsbeforeSide Stops. Insert a small pry bar between frame and Side Stopsand gently pry outwards. • Bundle Inside Stopsand place in protected area until reinstallation.
How big is 10° Mullion postuntil bow window?
10° Mullion Postuntil Bow Unit is complete. Completed Unit 5-Wide Unit shown in illustration. Follow the same assembly procedure for 2-Wide, 3-Wide, 4-Wide, 6-Wide, and 7-Wide Units.
What should I use to seal my bow window?
Unit must be properly flashed and sealed with sealant for protection against water and air infiltration. Use non-reflective flashings. Highly reflective flashing tapes can raise the surface temperature of the vinyl to the point where vinyl deformation and product damage may occur. • Do not apply any type of film to glass.
Flanges on the unit alone will not properly flash and seal the window. Follow these instructions carefully. For questions call 1-888-888-7020 Monday – Friday, 7 a.m. to 7 p.m. and Saturday, 8 a.m. to 4 p.m. central time. For more information and/or guides visit andersenwindows.com. Please leave this guide with building owner.
How to install Andersen tilt wash double hung windows?
Installation Guide for Andersen 400 Series Tilt-Wash Double-Hung Windows with Stormwatch Protection (High-Performance Impact Resistant, Monolithic Impact Resistant or Design Pressure Upgrade) “Andersen” and all other marks where denoted are trademarks of Andersen Corporation. ©2003-2008 Andersen Corporation. All rights reserved.
Unit Unit Unit Unit Unit • Turn units interior side up. • Carefully remove all Inside Stopnails with a hammer and block of wood. • Remove theHeadand Sill Inside StopsbeforeSide Stops. Insert a small pry bar between frame and Side Stopsand gently pry outwards. • Bundle Inside Stopsand place in protected area until reinstallation.
10° Mullion Postuntil Bow Unit is complete. Completed Unit 5-Wide Unit shown in illustration. Follow the same assembly procedure for 2-Wide, 3-Wide, 4-Wide, 6-Wide, and 7-Wide Units.