What are engineering change proposals?
What are engineering change proposals?
An engineering change proposal (ECP) is the management tool used to propose a configuration change to a configuration item (CI) and the system’s baselined performance requirements and configuration documentation established during design and development of the system (DoD 2001)
How long a contracting officer has to accept or reject a Value Engineering Change Proposal?
within 45 days
(b) The contracting officer is responsible for accepting or rejecting the VECP within 45 days from its receipt by the Government. If the Government will need more time to evaluate the VECP, the contracting officer shall notify the contractor promptly in writing, giving the reasons and the anticipated decision date.
What is a Class 2 change?
Class II changes are changes to correct documentation or changes to hardware not otherwise defined as a Class I change. Interchangeability is defined as when two parts possess such functional and physical characteristics as to be equivalent in performance, reliability, maintainability, etc.
What is an ECP in contracting?
An eligible contract participant (ECP) is an entity or individual allowed to engage in certain financial transactions that are not open to the average investor. ECPs are often corporations, partnerships, organizations, trusts, brokerage firms, or investors that have total assets in the millions.
What is the purpose of an engineering change order?
Engineering change order (ECO) definition An engineering change order (ECO) is a document that specifies either new product design details or proposed changes to existing products. ECOs provide a list of all the components, assemblies, and other documents that are affected.
What is a contract change proposal?
A contract change proposal is a document presented by a party, such as a client, to change the terms of a contract.
Which value is considered for value engineering?
Value engineering promotes the substitution of materials and methods with less expensive alternatives, without sacrificing functionality. It is focused solely on the functions of various components and materials, rather than their physical attributes. Value engineering is also called value analysis.
What are the Class 1 changes?
Re: What is the proper definition for Class 1 & 2 nonconformances
| Thread starter | Similar threads | Replies |
|---|---|---|
| B | True Position without tertiary datum? Establishing a proper rotation | 12 |
| J | Proper way to calibrate a check fixture | 7 |
| G | Proper Poundage for Checking XX Tolerance Plain Plug Gages? | 2 |
What is a Class 2 ECP?
Class 2 Criteria: An ECP proposing a change to approved configuration documentation for which the government is the CDCA or that has been included in the contractor statement of work by the tasking activity and which is not a Class 1.
How do you implement an engineering change order?
Key Stages of the Engineering Change Process
- Identify issue or need. Someone identifies a problem or issue and determines whether it requires a change.
- Investigate need. The appropriate person creates an engineering change request (ECR).
- Create ECO.
- Review and approve ECO.
- Implement change.
What should be included in an engineering change order?
Once the ECR is approved, an engineering change order (ECO) is generated, which lists the items, assemblies, and documentation being changed and includes any updated drawings, CAD files, material disposition codes, standard operating procedures (SOPs) or manufacturing work instructions (MWIs) required to make a …